JT2 was the general contractor and played a crucial role in constructing the MSG Media Dome and Studio, a specialized facility in Burbank, California, designed for developing digital content for the MSG Sphere located in Las Vegas. The project encountered a significant hurdle when a major wind event at 85% completion required the disassembly and reassembly of numerous project components.
JT2’s adept team ensured a swift recovery from the wind event in 30 days, marking the total project duration at 212 days. This exemplifies our resilient problem-solving and crisis management skills, confirming JT2's capability to execute complex projects efficiently.
MSG Media Dome and Studio
Contractor: JT2 Engineering and Construction
Client: MSG LLC
Project Location: Burbank, California
Design Firm: RPM Team, LLC
JT2’s adept team ensured a swift recovery from the wind event in 30 days, marking the total project duration at 212 days. This exemplifies our resilient problem-solving and crisis management skills, confirming JT2's capability to execute complex projects efficiently.
MSG Media Dome and Studio
Contractor: JT2 Engineering and Construction
Client: MSG LLC
Project Location: Burbank, California
Design Firm: RPM Team, LLC